Electrical

As provided by the show, your electrical requirements are elements beyond those that are part of your booth structure, such as lighting, light boxes, etc. These show-provided requirements consist of electrical power and labor to run power and install electrical components. Almost universally, electrical power and labor are provided directly from the show GC or event venue.

Calculating these requirements exactly can be tricky, but we can provide some rough guidelines to help you determine a good ballpark. As usual, you’ll want to refer to your exhibitor service manual to see prevailing labor and power rates.

One important thing to consider: Most shows offer an Advance Rate for placing your order prior to a deadline. When it comes to electrical, these rates can be significantly less if you are able to meet this order deadline. We encourage you to keep this in mind when calculating your budget here. Of course, once you begin your project, be sure to work with your Producer to ensure these deadlines are met for the best possible savings.

Power is most often provided to you in levels of watts (W) or amps (A). The typical options are 500W/5A, 1000W/10A, 1500W/15A, and 2000W/20A. These levels of power should be sufficient for most exhibits and their components.

  • Note – The only times you may need more power than this is if you have an overhead lighting rig or an elaborate overhead banner requiring electrical.

As these elements vary greatly and are quite complicated, if you do require this, we recommend you reach out to your Producers directly to determine the proper budget for your electrical needs. To determine your specific power quantities, consider the following:

500W is usually sufficient to cover:

  • One (1) large LCD/LED monitor with content driver
  • Approximately ten (10) to fifteen (15) LED lights
  • Five (5) non-LED lights (Which you should not be using!)
  • One (1) to three (3) laptops
  • Power strips for charging cell phones
  • One (1) fridge
    • Note – You will need 24-hr power for fridges so they don’t get turned off at the end of the day. 24-hr power is usually double the cost.

1000W is usually sufficient to cover:

  • Up to three (3) large LCD/LED monitors with content drivers
  • Approximately fifteen (15) to thirty (30) LED lights
  • Approximate ten (10) non-LED lights (Again, you should be using LED lights!)
  • Three (3) to six (6) laptops
  • Up to two (2) fridges
    • Note – You will need 24-hr power for fridges so they don’t get turned off at the end of the day. 24-hr power is usually double the cost.

1500W is usually sufficient to cover:

  • Up to five (5) large LCD/LED monitors with content drivers
  • Thirty (30) – forty-five (45) LED lights
  • Approximate fifteen (15) non-LED lights (Again, you should be using LED lights!)
  • Six (6) – nine (9) laptops
  • Up to three (3) fridges
    • Note – You will need 24-hr power for fridges so they don’t get turned off at the end of the day. 24-hr power is usually double the cost.

2000W is usually sufficient to cover:

  • Up to seven (7) large LCD/LED monitors with content drivers
  • Forty-five (45)+ LED lights
  • Approximate twenty (20) non-LED lights (Again, you should be using LED lights!)
  • Nine (9) – twelve (12) laptops
  • Up to four (4) fridges
    • Note – You will need 24-hr power for fridges so they don’t get turned off at the end of the day. 24-hr power is usually double the cost.
  • One (1) steamer
  • One (1) coffee or espresso maker

An important thing to consider is that these power points represent one point which will come from the show main power, ran under your carpet or flooring, and to another point in your exhibit. Cords branching from these power point locations cannot be run again under carpets due to fire codes. So, anything that will be connected to a power point must be connected with extension cords/power strips above the flooring.

How does this impact you? Let’s look at a few examples. Let’s say you have a total of forty LED lights in your exhibit, but they are spread out in four different places throughout the exhibit. You may think you can just get a 2000W power point and be covered, but that would be incorrect. You’ll need to get four 500W power points, each one being ran to each location under your flooring/carpet with the ten lights. Typically, this will cost more, as the price for a 2000W power point is most often not just 4x the cost of a 500W power point. This concept should be applied to all your needs to determine your exact power requirements.

Given the above considerations and the general outlines we’ve provided, your next step is to estimate your overall power needs based on your exhibit needs. Once you’ve got that, multiply the quantities of power by their show rates, and you’ll have your power budget. Don’t forget to multiply by your Producer’s service fee if needed as well. If you’d like to use some very rough figures, and again these vary GREATLY all over the country, we recommend you use the following, which we’d consider advance rates:

  • $125/500W
  • $175/1000W
  • $225/1500W
  • $275/2000W

Again, these vary greatly, with more expensive states most likely running higher, and less expensive states running lower. As well, standard rates will run higher than this. Lastly, these figures are show rates and do not factor in any Producer fees.

The next major expensive when it comes to your electrical budget will be the labor for electricians to run your power lines from the main power drop under your carpet to the points needed, which is typically called “distribution”, and then labor to come back to your booth to mount lights, hang monitors, and install any other elements that are required to be installed by electricians.

Again, you’ll need your trusty exhibitor service manual to find two important things.

  1. First is the labor rate for ST and OT/DT.
  2. Next is a description of exactly what electricians must install. Different convention centers, even in the same city, have different requirements.
    1. For example, in Las Vegas, at the Mandalay Bay Convention Center, electricians must be hired to hang monitors. But at the Sands Convention Center? Your install team must do that. These can lead to significant budgetary differences, so it’s important to know.

Once you have that figured out, use the guidelines below to determine you budget.

To determine ST/OT, take a look at your move-in schedule.

  • Note – Distribution labor will usually occur the day before your target move-in date. If your target move-in is a Monday, you can assume your distribution labor will occur on Sunday or Saturday, on OT.

Typically, an electrician can run a line every five minutes or so. It’s safe to figure that if you have ten (10) or less points, that it should not take more than an hour or two to run these. For 10-20 points, figure two hours, and so on.

Many shows simply charge you 50% of the install labor cost, regardless of how long dismantle actually takes. Refer to your exhibitor service manual for your show’s policy here.

If that is not the case, actual dismantle time required is usually much faster, and you can safely budget 25% – 50% of the installation time you’ve estimated for this ballpark.

If you’d like to use some very rough labor rates, and again these vary GREATLY all over the country, we recommend you use the following, which we’d consider advance rates:

  • ST – $100 per electrician, per hour
  • OT – $200 per electrician, per hour

Again, these vary greatly, with more expensive states most likely running higher, and less expensive states running lower. As well, standard rates will run higher than this. Lastly, these figures are show rates and do not factor in any Producer fees.

Sign Up For EventWeb Free

Connect with Industry Experts Today.

Sign Up Now

Are you ready to create the perfect resume for your next tradeshow?

 Check out EventWeb's Resume Wizard and make sure you stand out from the crowd!

Resume Wizard

Are you ready to create the perfect RFP for your next tradeshow project?

Use EventWeb’s FREE one-of-a-kind RFP Wizard to generate a Request For Proposal that ensures your next round of bids comes in flawless.

Create Your FREE RFP Today